What Rotterdam’s feeder waiting times tell a supply coordinator
Rotterdam’s 2025 feeder figures give buyers a reason to reconfirm the berth before releasing a delivery.
What the port recorded
The Port of Rotterdam’s 2025 report counted 1,838 feeder calls, down from 2,049 in 2024. Yet their combined waiting time inside the port rose from 18,335 to 23,759 hours. The port describes a feeder rotation that can take a vessel to several terminals, each with its own berth plan.
The figures cover a full year of calls. For an individual order, the useful information is still the vessel’s latest terminal, berth and expected time alongside.
Port of Rotterdam, 2025 Digital Report on feeder berth planning
Agree when the supplier can dispatch
At quotation, tell the supplier which stop on the rotation is intended for delivery. Ask the agent when the berth is likely to be confirmed and the supplier when the vehicle must leave to make that window.
Before dispatch, put the terminal, berth, local time window and receiving contact into one update. If the vessel is moving to another terminal, have the agent confirm access there and the supplier acknowledge the revised handover. A vessel can already be in port while the right delivery berth is still hours away.
